State Highway Electrification Plan

Need Help? Something Missing?

Email the Technical Response Service or call 800-254-6735.

The Florida Department of Transportation (FDOT) must create a master plan for the development of electric vehicle supply equipment EVSE) along the State Highway System by July 1, 2021. FDOT will also establish staging area that will include EVSE at key locations along the State Highway system to be used as emergency evacuation stops. A status report on the project is due to the Governor by December 1, 2020. (Reference Florida Statutes 339.287 and 338.236)