State Highway Electrification Plan

Something Missing?

Email the Technical Response Service or call 800-254-6735.

The Florida Department of Transportation (FDOT) must create a master plan for the development of electric vehicle supply equipment (EVSE) along the State Highway System by July 1, 2021. FDOT will also establish staging area that will include EVSE at key locations along the State Highway system to be used as emergency evacuation stops. FDOT published the Electric Vehicle Master Plan in 2021. (Reference Florida Statutes 339.287 and 338.236)