Utility Company Electric Vehicle (EV) Charging Load Projection Requirement

Something Missing?

Email the Technical Response Service or call 800-254-6735.

The Public Utilities Regulatory Authority requires electric distribution companies to integrate EV charging load projections into distribution planning. Projections will be based on the number of EVs registered in the state as well as projected fluctuations in EV sales. Electric distribution companies must publish annual reports detailing the EV charging load projections for the company’s distribution planning.

(Reference Connecticut General Statutes 16-19fff)